The final testing for the Motion Master 30 was carried out in our own purpose designed test facility in Derbyshire UK and saw the system being given a rigorous workout.
Packed with over four tons of ballast, it ran 24 hours a day for over 32 days, to simulate a non-stop three-month run and passed with flying colours.