Video
The Motion Master 30 3DOF ride system undergoing final factory testing
The final testing for the Motion Master 30 was carried out in our own purpose designed test facility in Derbyshire UK and saw the system being given a rigorous workout.
Packed with over four tons of ballast, it ran 24 hours a day for over 32 days, to simulate a non-stop three-month run and passed with flying colours.


















